Smooth-On Liquid Rubber and Plastics - Your source for Mold making and Casting supplies!
Home Technical Info How To Frequently Asked Questions Media Gallery News Find a Distributor Mold Makers Directory
                   
McAfee Secure sites help keep you safe from identity theft, credit card fraud, spyware, spam, viruses and online scams
About Us Seminars Tech Support Contact My Account Buy Now Smooth-On Home
Applications
Architectural Applications
Candlemaking
Concrete Casting
Encapsulation and Display
Home Projects
Industrial
Lifecasting
Modelmaking and Hobbies
Orthotics & Orthopedics
Prototyping
Sculpture
Special Effects
sprayable
Vacuum Bagging
Taxidermy
Themed Environments
Smooth-On Products
Getting Started
Castable Epoxy Resins
Polysulfide Rubber
Silicone Rubber
Urethane Rubber
Urethane Plastic
Rigid & Flexible Foams
Lifecasting
duoMatrix
duoMatrix
Adhesives
Release Agents and Sealers
Supplies, Tools, and Equipment






Making Molds To Replace Crumbling Stonework at a University In Australia

PROJECT:
Make molds to replace crumbling stonework at a university in Australia.

PROBLEM:
Project Deadline

ANSWER:
Using Smooth-On's EZ-Spray® Jr. system and EZ-Spray® Silicone Rubber

Adelaide University's Bonython Hall in South Australia was in need of renovation. As part of the project, two domes at the back of the building had to be replaced due to the deterioration of the stone work. It was decided that an eight-section mold of one of the domes would be created. This mold could then be used for the recasting, in glass reinforced concrete, of both domes.

Russell Brown from Rubber Impressions was contracted to make the molds. After seeing a demo of Smooth-On's EZ-Spray® Jr. system, Brown decided to make the dome molds from EZ-Spray® Silicone backed with a mother mold of fiberglass.

The domes consisted of eight segments, each 2.6m high and 1.1m wide at the base, which were shimmed and sealed with Smooth-On's Super Seal®. Each section took about 6 hours to spray. Following the application of EZ-Spray® Silicone, each section was then given a “smooth” coat of Smooth-Sil® 930 thickened with Thi-Vex® to fill any holes or unevenness on the surface of the EZ-Spray® silicone. This also helped prevent any mechanical lock on of the fibreglass support jacket.

Brown estimated that had he used a brushable polyurethane rubber each individual panel would have taken three days to mold. The EZ-Spray® Jr. system saved him more than two weeks time and thousands of dollars in labor costs.
 Gallery Image

1 - Bonython Hall on the campus of Adelaide University in South Australia
 Gallery Image

2 - One of the eight-sided domes being prepared for the mold making process.
 Gallery Image

3 - Parting shims were created from clay and wood to segment the dome. Smooth-On's Super Seal® was used to seal the stone surface and shims.
 Gallery Image

4 - Smooth-On's EZ-Spray® silicone is sprayed in layers over the original
 Gallery Image

5 - The EZ-Spray® Jr. gun is highly maneuverable allowing mold rubber to be applied to undercuts and hard to reach areas.
 Gallery Image

6 - Typically 4 layers are sprayed to an ultimate thickness of 3/8'' (1cm).
 Gallery Image

7 - Smooth-Sil® 930 is thickened with Thi-Vex® thickening agent. Thickened rubber is used to fill deep undercuts to prevent mechanical lock between the support shell and the original model.
 Gallery Image

8 - The process is repeated as sections are completed one at a time.
 Gallery Image

9 - Mold making in progress
 Gallery Image

10 - Once the mold rubber has full cured, support shell segments are created using fiberglass and resin.
 Gallery Image

11 - Shell is built in eight pieces with supports embedded for better structure
 Gallery Image

12 - Once the support shell has fully cured, sections are removed exposing the cured rubber mold.
 Gallery Image

13 - E-Z Spray® silicone is flexible and can be peeled back from the original
 Gallery Image

14 - Silicone has good tear strength.
 Gallery Image

15 - Rubber mold segments are then seated into their respective support shells.
 Gallery Image

16 - Mold segments are readied for transport to Rubber Impressions' casting facility.
 Gallery Image

17 - At the casting facility, mold sections will be re-assembled
 Gallery Image

18 - EZ-Spray® sections ready for assembly and GFRC casting

Show the world what you're doing - Click Here


 Back to Previous Page


Share   |   Digg this Digg this   |   Google Bookmark Google Bookmark this   |   Add  to Yahoo myWeb Add to Yahoo myWeb
Smooth-On, Inc. | Copyright © 2008
2000 Saint John Street, Easton PA 18042 | Order Desk: 800.762.0744 | Fax: 610.252.6200 | Tech Help: 610.252.5800

E-Commerce Solutions