
7 - The mold is placed in the center of the base board. The base board insulates the mold from the concrete floor. Note: DO NOT place the mold or casting directly on a wood floor, table etc. Only use the hot box on a concrete floor or slab. |

8 - The hot box is lowered over the mold and base board, making sure the mold is not too close to the sides and that all sides are flush to the floor. |

9 - The heater is fit into the box port. This heater produced an ambient temperature of 203°F (95°C) in 5 min. |