How To Make a Large Scale Formliners with VytaFlex™ Mold Rubber
Step 4: Preparing Mold For Concrete
Containing walls are positioned to hold concrete. Concrete release agent is applied to the mold liner prior to casting concrete. The rebar substructure is prepared and then the substructure is positioned over the rubber liner.
Smooth-On, Inc. will be closed Thursday - Friday, November 27th - 28th in observance of Thanksgiving. Resuming normal operations on Monday, December 1st.