How To Cast a Concrete Fence Which Exhibits Detail Never Seen Before
Step 4: Casting with GFRC
A face coat of GFRC is sprayed onto the mold surface using a hopper gun, followed by a base pour of concrete and chopped glass. The mix is leveled off and allowed to cure for 4 hours.